Our current store is a collection of three buildings that were built over a 20 year period. The east section was originally built as a free standing sign shop. We purchased this building in 2014 and gutted it so we could add it into our store. We left the sewer and water stubbed out of the floor and hid it under our birding display. It sure came in handy as we started to plan for where the cafe would go.
So we cut a channel in the concrete for the grease trap, floor sinks, floor drains, sewer lines and water line. Thanks to Ryan and Lana Weaver for helping make the cuts and to D&J Construction for providing the saws to do the cutting work.
It took a couple of weeks to work through getting the water and sewer lines in and inspected. Now we will be able to fill the backfill and pour new concrete over the channel. Next up is new walls…